Project Budget
$63,600
Project Summary
As part of the upkeep, safety, and maintenance of Sugar Creek, staff propose completing total milling and repaving of the cart path from Hole #1 to the maintenance bridge. The 705 linear feet of path along the first hole is in the poorest condition on the course. Although sealcoating and maintenance extends the life of the asphalt, it eventually deteriorates based on time, exposure, and frequency of pedestrian and cart traffic. Besides ensuring safe pedestrian and cart use, paving projects also reduce future environmental stress and maintenance costs.